Requirement:
- Display the list of components required/relevant for an equipment in a repair service Order
Solution:
- Use TCode CS01 to create a Bill of Material with Usage-4 (Plant Maintenance).
- During the creation of the Service Order (IW31/IW32), Click the 'Operations' Tab, and then click the General tab and bottom left of the screen.
- Enter the BOM material created from CS01 in the 'Assembly' field and hit Enter.
- Click the 'Assembly' Icon to the bottom of the Screen.
No comments:
Post a Comment